-
Notifications
You must be signed in to change notification settings - Fork 7
Sensor kit deployment
Mario Frei edited this page Dec 14, 2018
·
3 revisions
- We recommend assembling the entire sensor kit in the workshop, including charging of the batteries. Once all the nodes are working in the workshop, the kit can be packed up in a box be transported to the site where the measurements are going to take place. Since the gateway is battery operated, it can be transported in operational condition.
- Upon arrival on the site, place the gateway first and ensure that it is transmitting the data to the web server. (E.g. by setting one sensor node in debugging mode).
- Then start placing the sensor nodes. We recommend noting the position of the sensors on a floorplan.
- Tools and Materials:
- Adhesives and fastener
- Thermal Tape
- Double sided tape
- Outdoor
- Tesa Power Strips
- Heat conductive
- Pattafix
- Electrical tape
- Universal Duct tape
- Painters tape
- Zip ties / velcro ties
- Cleaning
- Adhesive remover (Tesa)
- Acetone
- Window cleaner
- Dust brush
- Rag
- Paper towel
- Glass scraper
- Sand paper
- Trash bag
- Latex gloves
- Adhesives and fastener
- Tools
- Screwdriver
- Knife
- Mutlimeter
- Stepladder
- Electronics
- Arduino ISP programmer
- FTDI programmer
- XBee programmer
- Camera
- Thermal camera - Extension cords
- Multi-plugs
- Spare parts
- Documents
- Information sheet for building owners
- List with sensor locations
- Questionnaire
- Pen
- Clipboard
- Other
- Pipe insulation
- Trolley