Skip to content

Add spec for curve input validation #3365

@kaskranenburgQ

Description

@kaskranenburgQ

Description

In the Solar curves project we changed the modeling of the solar pv inputs.
Before, the solar pv curve was blended with a flatter curve when setting the flh inputs.
This was to prevent that the maximum output of the technology would exceed the installed capacity.
This can occur due to the stretching of the very bumpy solar pv-curves.
In the new modeling, we limited the bandwith of the FLH's to prevent that the maximum output of the technology would exceed the installed capacity.

It is not set in stone that this bandwith is future proof for new curves.
We should therefore implement a document validation spec that checks whether the bandwith is still appriopriate for the curve.


Proposed Improvement

The curve should adhere to the following:

  • max of curve normalised to 1
  • should not exceed 1/(flh * max_input_factor)

Where currently max_input_factor = 1.2

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions