What this PR does / why we need it:
Takes over #518

Which issue this PR fixes (optional, in fixes #<issue number>(, fixes #<issue_number>, ...) format, will close that issue when PR gets merged): fixes #

Special notes for your reviewer:
This needs #527

Release note:

NONE

@jetstack-bot jetstack-bot added release-note-none Denotes a PR that doesn't merit a release note. dco-signoff: no Indicates that at least one commit in this pull request is missing the DCO sign-off message. labels Sep 25, 2018
@jetstack-bot
Copy link
Collaborator

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by:
To fully approve this pull request, please assign additional approvers.
We suggest the following additional approver: dippynark

If they are not already assigned, you can assign the PR to them by writing /assign @dippynark in a comment when ready.

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@jetstack-bot jetstack-bot added the size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. label Sep 25, 2018
@jetstack-bot jetstack-bot added dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. and removed dco-signoff: no Indicates that at least one commit in this pull request is missing the DCO sign-off message. labels Sep 25, 2018
@MattiasGees MattiasGees force-pushed the e2e-integration-tests branch from 77af3f2 to 6c39dcb Compare October 5, 2018 14:44
@jetstack-bot jetstack-bot removed the needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. label Oct 5, 2018
@MattiasGees MattiasGees force-pushed the e2e-integration-tests branch from 8e80664 to e730913 Compare December 18, 2018 12:37
simonswine and others added 6 commits December 19, 2018 14:32
Signed-off-by: Christian Simon <simon@swine.de>
Signed-off-by: Christian Simon <simon@swine.de>
Signed-off-by: Mattias Gees <mattias.gees@gmail.com>
Signed-off-by: Mattias Gees <mattias.gees@gmail.com>
Signed-off-by: Mattias Gees <mattias.gees@gmail.com>
Signed-off-by: Mattias Gees <mattias.gees@gmail.com>
@MattiasGees MattiasGees force-pushed the e2e-integration-tests branch from adbaa57 to 7acb64a Compare December 19, 2018 13:34
@MattiasGees
Copy link
Member Author

Tested this all now and both tests pass. I created a branch that merges #544 and #527 to test this
https://github.com/mattiasgees/tarmak/tree/e2e-integration-tests-with-destroy-env

I will now look into upgrading of Tarmak tests.

Signed-off-by: Mattias Gees <mattias.gees@gmail.com>
Signed-off-by: Mattias Gees <mattias.gees@gmail.com>
Signed-off-by: Mattias Gees <mattias.gees@gmail.com>
Signed-off-by: Mattias Gees <mattias.gees@gmail.com>
Signed-off-by: Mattias Gees <mattias.gees@gmail.com>
Signed-off-by: Mattias Gees <mattias.gees@gmail.com>
Signed-off-by: Mattias Gees <mattias.gees@gmail.com>
Signed-off-by: Mattias Gees <mattias.gees@gmail.com>
@MattiasGees
Copy link
Member Author

MattiasGees commented Dec 20, 2018

I have the following scenarios covered now:

  • Setup single cluster
  • Setup multi cluster
  • Upgrade of Tarmak from latest release to master release
  • Upgrade of Kubernetes

TODO:

  • Make sure tests can run all at once (possible spread over multiple regions)
  • Make running limited amount of tests possible (eg only the single cluster setup)
  • Make running Sonobuoy possible as optional test

@jetstack-bot
Copy link
Collaborator

@MattiasGees: PR needs rebase.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

@jetstack-bot jetstack-bot added the needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. label Jan 15, 2019
@MattiasGees
Copy link
Member Author

Replace by #743
/close

@jetstack-bot
Copy link
Collaborator

@MattiasGees: Closed this PR.

In response to this:

Replace by #743
/close

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository.

Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Labels

dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants